In some cases, SolarEdge Home battery upgrade failed.In some cases, firmware upgrade may have failed.Consumption power was incorrect for Inline meter connected via RS485 and configured to measure consumption. Modbus TCP over WiFi refused connection.SolarEdge Home Battery High Voltage connected via RS485 to inverter was detected only after inverter AC cycle.Inline meter displayed apparent current instead of active current in the Meter Status screen.Note: Modbus TCP over Ethernet and Modbus TCP over RS485 for all inverters are supported.Modbus TCP over Wi-Fi for commercial inverters is blocked.Modbus TCP over unsecured Wi-Fi is blocked.Modbus TCP over secured Wi-Fi is now officially supported for residential inverters.SolarEdge Home Network now supports also South Africa.Such a detection locks production accordingly for increased safety S-series optimizers now supports “SolarEdge Sense Connect” for detecting abnormal temperatures on optimizer’s connectors.SE8000H & SE10000H inverters now support SolarEdge Home Battery High Voltage.Release Notes New Features & Enhancements This requires connecting to the device's Wi-Fi and upgrading the firmware. Improvements included in this version will apply only after the version is updated on the device. To verify the version is updated on the device after the upgrade process, use SetApp to connect to the device, and verify the firmware versions match the tables above (or show higher versions). These firmware versions were released to SetApp packages in September 2022 for all SolarEdge SetApp-enabled devices.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |